HomeStore

TLD Flowline SE Mips Helmet - Radian Navy/Titanium -

Product image 1
Product image 2
Product image 3
Product image 4

TLD Flowline SE Mips Helmet - Radian Navy/Titanium -

TLD Flowline SE Mips Helmet - Radian Navy/Titanium -

Be sure to stay safe on your bike rides with the Flowline SE Helmet from Troy Lee Designs. This half-shell helmet seamlessly combines safety, comfort and style. Enjoy reliable impact absorption and a breathable airflow system with the helmet's design. Plus, the easy-to-use magnetic buckle ensures a secure closure every time. Conquer the mountain bike trails, or city streets, with the Troy Lee Designs Flowline SE Helmet.

SPECIFICATIONS

  • 3-Way adjustable screwless visor
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment
  • 14 vents for maximum airflow 
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Fidlock® Magnetic Buckle System
  • Dual Density EPS for low and high-speed impacts
  • Anti-microbial Quick Dry Premium Liner
  • Side strap adjusters 
Select Size
From $41.29

Original: $117.98

-65%
TLD Flowline SE Mips Helmet - Radian Navy/Titanium -

$117.98

$41.29

Product Information

Shipping & Returns

Description

Be sure to stay safe on your bike rides with the Flowline SE Helmet from Troy Lee Designs. This half-shell helmet seamlessly combines safety, comfort and style. Enjoy reliable impact absorption and a breathable airflow system with the helmet's design. Plus, the easy-to-use magnetic buckle ensures a secure closure every time. Conquer the mountain bike trails, or city streets, with the Troy Lee Designs Flowline SE Helmet.

SPECIFICATIONS

  • 3-Way adjustable screwless visor
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment
  • 14 vents for maximum airflow 
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Fidlock® Magnetic Buckle System
  • Dual Density EPS for low and high-speed impacts
  • Anti-microbial Quick Dry Premium Liner
  • Side strap adjusters